Greater San Antonio · Bexar / Wilson County · Texas Triangle

An integrated industrial infrastructure platform.

The only dual Class I rail park in the San Antonio–Austin corridor that also generates its own power, steam, chilled water and industrial water on site. Rail, land, and utilities — one platform, one operator, 20‑year certainty.

2 × Class IUnion Pacific + BNSF, on site
65,000 LFRail sidings & storage
I‑10 · I‑35 · I‑37Coast to coast · Canada to Mexico
20–120 MWPrime on‑site power
5,000 TSteam + chilled water
600M gal/yrGuaranteed water rights
Why Mission Rail Park

Six things no other site in the corridor can offer together.

Rail parks offer track. Utility districts offer power. Mission Rail Park is the only site in a survey of 34 industrial parks across Greater San Antonio–Austin that puts dual Class I rail, interstate access, prime generation, thermal energy and guaranteed water on the same 1,000 acres — under one operator, ready for a manufacturer to build.

01 · RailExisting
2 × Class I

Union Pacific and BNSF both connected into the park — unit‑train capable, with on‑site switching, transload and car storage by Gravity Rail.

65,000 LF of track · 800+ railcar storage spots · 150‑car unit trains
02 · HighwayExisting
I‑10 · I‑35 · I‑37

Adjacent via Loop 1604 — east–west coast to coast on I‑10; north to Canada and south to Laredo and Mexico on I‑35 / I‑37.

~30 min to downtown San Antonio & SAT airport
03 · PowerFunded · 2028
20–120 MW

Prime on‑site gas‑turbine generation, N+1, with battery and solar ride‑through — not dependent on public utility supply.

15–20 MW initial mid‑2028 · full build‑out 2032 · 99%+ availability
04 · Chilled waterFunded · 2028
5,000 T

Steam‑driven absorption chillers deliver metered chilled water by pipe for process and space conditioning — no tenant chillers, towers or maintenance contracts.

2–8,000 T metered service · 25% below self‑generation
05 · SteamFunded · 2028
Steam >85%

Waste‑heat recovery from turbine exhaust turns 1,000 °F heat into process steam, delivered by insulated pipe to each facility.

$2.80 vs $8.80 per 1,000 lb · 68% savings vs tenant boilers
06 · WaterExisting
600M gal/yr

On‑site well water — 1,840 acre‑feet a year guaranteed by water rights exclusive to park tenants — plus wastewater treatment and reuse on campus.

Carrizo‑Wilcox aquifer · San Antonio River discharge
Two products · one platform

The land and rail platform is open today. The utility overlay is funded and in build.

Prospects care about a different half depending on where they are in the decision. Both are designed to be contracted together: buy or lease the parcel, then sign a 20‑year service agreement for power, steam, chilled water, water and wastewater.

Mission Rail Park · today

The land + rail platform

~1,000 acres straddling Bexar and Wilson Counties, ±500 acres for sale or lease in combinable lots from 4 to 150 acres. Full‑service rail operator on site. Outside San Antonio's ETJ, in an air‑quality attainment area, with clean Phase 1 and developable soils.

  • Acreage1,000 total · 500+ for sale or lease · lots 4–150 ac
  • Rail2 × 8,000 ft unit‑train tracks · 20,000 ft loop + seven 4,000 ft storage tracks engineered
  • OperatorGravity Rail — switching, transload (dry bulk · liquid · hazmat), car storage, repair, truck scale
  • SiteOn‑campus detention · subgrade materials on site · natural drainage · rail installation below market cost
  • TenantsTwin Eagle Terminals (40 ac) · Harris Heavy Haul (10 ac)
  • PermittingOutside SA ETJ · attainment area · abatements & incentives available
MRP / Energy Center · funded · mid‑2028

The utility overlay

A combined heat & power plant inside the park: gas turbines produce electricity, their exhaust makes steam, the steam drives absorption chillers. Every service is metered and piped to the tenant under a 20‑year agreement with guaranteed min/max hourly volumes.

  • Gas supply500 psig 10" pipeline (~$10M new capital) + 15 MW utility substation for in‑park distribution
  • Generation15–22 MW turbine units · 20 → 120 MW · N+1 · battery + solar ride‑through · 99%+ availability
  • ThermalSteam from waste‑heat recovery · 2–8,000 T chilled water from absorption chillers
  • WaterIndustrial / potable supply and wastewater profile per tenant · treated on site · reused or discharged to San Antonio River
  • Contract20‑year service agreements · guaranteed min–max hourly volumes · lowest current and long‑term cost vs utility
  • AdjacentMegaCharger Class 8 EV truck charging supplied by the Energy Center
Rail

Two of the largest railroads in North America. One park.

Only six Class I carriers serve the United States. Mission Rail Park has both Union Pacific and BNSF connected on site — which means competitive rail pricing, North‑America‑wide reach to source raw materials and distribute finished goods, and unit trains received and departed with switching and transload handled by the park's operator.

  • 01
    Dual Class I interchange

    UP + BNSF, co‑located with the Union Pacific railyard. Cross‑border reach to Mexico and Canada.

  • 02
    Unit‑train capable today

    Two 8,000 ft unit‑train tracks; extra‑large trains up to 150 cars; multiple unit trains per day plus manifest service.

  • 03
    Engineered for expansion

    20,000 ft loop and seven 4,000 ft storage tracks engineered, all with access to both carriers — built to tenant need.

  • 04
    Full‑service operator on site

    Gravity Rail: switching, transload (dry bulk, liquid, hazmat), car storage, repair, park‑owned shunt locomotives and track equipment, truck scale.

Rail plan & lot map Parcel inquiry
Twin Eagle dry-bulk silos on site at Mission Rail Park, covered hopper cars spotted beneath them against a clear sky
Union Pacific locomotives leading a train onto new track at Mission Rail Park
Union Pacific, on siteClass I service · UP railyard co‑located
Aerial view of the 8,000-foot unit-train tracks running straight across the park with a train on the far track
Unit‑train tracks2 × 8,000 ft · built and in service
Aerial view of the Twin Eagle transload terminal: silos, loading pad and a string of railcars curving along the lead track
Twin Eagle terminal40‑acre transload tenant · dry bulk
Stone monument sign reading Mission Rail Park, San Antonio, Texas at the park entrance
9377 CR 128, FloresvillePark entrance · 30 min from downtown San Antonio
Location

In the Texas Triangle. On the freight corridor. Outside the ETJ.

Satellite view with the ~1,000-acre Mission Rail Park property outlined, County Road 128 along its northern edge and the Union Pacific line beyond
Property boundary · ~1,000 ac · Bexar / Wilson County line · CR 128 frontage

Thirty minutes from downtown San Antonio and the international airport, at 9377 CR 128, Floresville — inside the San Antonio–Houston–Dallas triangle, on the I‑35 corridor TxDOT has designated a priority freight and growth corridor through 2030, with regional road links to Port of Houston and the Gulf Coast ports.

  • I‑10

    East–west, Florida to California — the country's southern freight artery.

  • I‑35

    North to Dallas, the Midwest and Canada; south to Laredo, the busiest inland port on the Mexico border.

  • I‑37 · US‑181

    South to Corpus Christi and the Gulf Coast ports; direct connection via Loop 1604.

  • SAT · 45 min

    Air cargo at San Antonio International; deep‑water container and break‑bulk terminals at Houston.

Interstate freight corridor at blue hour with long-exposure truck light trails across a flat Texas horizon
16.7%San Antonio population growth since 2010 — fastest‑growing top‑10 US cityUS CENSUS
+4.6%Employment growth YoY — #1 among the top 35 metrosBLS
21.2%Warehouse labor growth on the I‑35 corridor over 10 yearsI‑35 CORRIDOR
$28.7BTexas computer & electronics manufacturing, annual gross state productTEXAS GSP
MRP / Energy Center

Prime power, steam and chilled water — made inside the park, sold by the hour.

Combined heat and power at industrial scale. High‑efficiency gas turbines generate electricity; integrated waste‑heat recovery turns the exhaust into steam; absorption chillers turn steam into chilled water. Overall energy conversion above 85%, N+1 reliability with battery ride‑through, and every service delivered to the tenant by pipe and wire under a 20‑year agreement.

Combined heat and power plant at dusk: turbine hall, exhaust stacks and insulated steam and chilled-water pipe racks
01 · INPUT

Natural gas

500 psig, 10" dedicated pipeline into the park. Natural gas is close and built in at reasonable cost.

~$10M new capital15 MW utility substation for in‑park distribution
02 · GENERATE

Gas turbines

15–22 MW industrial units added incrementally from 15–20 MW in mid‑2028 to 120 MW+ by 2032.

N+1 · 99%+ availabilityBattery + solar ride‑through · utility interconnect backup
03 · RECOVER

Steam → chilled water

1,000 °F exhaust converted to process steam; steam drives absorption chillers — no compressor electricity.

>85% conversion efficiency2–8,000 T metered chilled water
04 · DELIVER

To each tenant

Electricity, steam, chilled water, industrial/potable water and wastewater — metered, by pipe and wire, to the plant fence.

20‑year service agreementGuaranteed min–max hourly volumes
15–20 MWInitial capacity, beginning mid‑2028
120 MW+Incremental turbine expansion to full build‑out by 2032
2–8,000 TMetered chilled water service for process and space conditioning
99+%Turbine generation availability, backed by battery storage and utility interconnection
ServiceSavingsCost comparisonWhy
Electricity$ / kWh
37%SAVINGS
Utility / self‑gen  > $0.14
MRP Energy Center  < $0.10
CPS Energy (via FELPS) is the only regional utility option — no regional alternative exists for tenants. On‑site prime power removes the dependency.
Chilled water$ / ton‑hr
25%SAVINGS
Tenant chillers & towers  $0.16
MRP Energy Center  $0.12
Steam‑driven absorption chillers eliminate compressor electricity. Tenant avoids chiller and cooling‑tower capex and contracted maintenance.
Steam$ / 1,000 lb
68%SAVINGS
Tenant boilers  $8.80
MRP Energy Center  $2.80
Steam is a by‑product of turbine exhaust heat, delivered by insulated pipe — no boiler plant, no boiler labor, no boiler maintenance.

More than 100 district heating and cooling systems already operate across the US — including the San Antonio District Cooling Company downtown. The Energy Center brings that model to a manufacturing park: a typical 12+ month tenant construction period lets the plant add generation and thermal capacity ahead of occupancy, so N+1 supply is in place on day one.

Energy Center one‑line diagram Model your load
Competitive position

Of 34 industrial parks surveyed in the corridor, one is energy‑enabled and dual Class I.

The alternatives in Greater San Antonio–Austin offer land, or a single carrier, or a substation. None offer on‑site generation, thermal energy and water rights with both railroads on the property.

FeatureMission Rail ParkPort San AntonioUP Transload FacilityAlamo Junction
Acreage · total / available1,000 / 5001,900 / 5002,000520 / 300
Class I railBoth UP + BNSFUP · limited accessUP only✗ None
On‑site generation20–120 MW prime✗ NoSubstation✗ No
Steam + chilled waterBoth, piped & meteredChilled water service✗ No✗ No
Water rights on siteUp to 600M gal/yr, on‑site wellsLimited municipalLimited municipalLimited municipal
Land price · $/SFOn requestN/A (public)N/AN/A
Who it's for

Three routes to the same 1,000 acres.

High‑volume, rail‑served manufacturers and processors that use power, heat, cooling and water — and that add value to the park's ecosystem. Not standalone data centers.

Active pipeline

Manufacturers already reviewing parcels — each to be served with on‑site electricity, steam, chilled water and industrial water.

TenantIndustryInvestmentJobsAcresMWStatus
ECOR TexasComposite panels$225M160628Land purchase agreement issued · $100M state bond approved · 50% county tax abatement received
Project Ammo CanDefense ammunition$225M250204In active review
Project Fresh FoodBlended fertilizer$60M150502Active site selection underway
Project Ferris WheelAuto components$77M180251Preliminary offer submitted
MegaCharger StationEV truck charging$2–3M3–553–4Supplied by MRP / Energy Center
Team & partners

Developer, operator, utility, broker, designer, county — already at the table.

The collaboration between the State of Texas, the City of San Antonio, Wilson County and the Floresville EDC has been the platform that lets the park fit the needs of a wide array of end users. Logos shown here in one ink; final marks to follow.

Frontier LogisticsLead developer
Pascal One VenturesPartner
ECOR GlobalEnergy Center · anchor tenant
Gravity RailRail operator
CBREExclusive brokerage
West East Design GroupMaster plan
FELPSRegulated electric utility
Wilson County · Floresville EDCIncentives & permitting
"When you have service from two of the largest railroads in the country, it gives you not just nationwide, but North America‑wide rail interconnectivity … That's a very big deal."Jason Jennaro · Partner, Mission Rail Park · Founder, Pascal One Ventures
"It has very developable dirt — clean, stable, environmentally sound. In my experience, it's the cheapest location I've ever found to do any type of development work."John Vossler III · President, Frontier Logistics
Broker kit · site tour · parcel inquiry

Get the fact sheet, lot map and Energy Center diagram.

Or book a site tour — 30 minutes from downtown San Antonio. Land pricing available on request through CBRE.

PDF e‑brochure · metric + imperial · EN / JA / KO / ES on request