Union Pacific and BNSF both connected into the park — unit‑train capable, with on‑site switching, transload and car storage by Gravity Rail.
65,000 LF of track · 800+ railcar storage spots · 150‑car unit trainsThe only dual Class I rail park in the San Antonio–Austin corridor that also generates its own power, steam, chilled water and industrial water on site. Rail, land, and utilities — one platform, one operator, 20‑year certainty.
Rail parks offer track. Utility districts offer power. Mission Rail Park is the only site in a survey of 34 industrial parks across Greater San Antonio–Austin that puts dual Class I rail, interstate access, prime generation, thermal energy and guaranteed water on the same 1,000 acres — under one operator, ready for a manufacturer to build.
Union Pacific and BNSF both connected into the park — unit‑train capable, with on‑site switching, transload and car storage by Gravity Rail.
65,000 LF of track · 800+ railcar storage spots · 150‑car unit trainsAdjacent via Loop 1604 — east–west coast to coast on I‑10; north to Canada and south to Laredo and Mexico on I‑35 / I‑37.
~30 min to downtown San Antonio & SAT airportPrime on‑site gas‑turbine generation, N+1, with battery and solar ride‑through — not dependent on public utility supply.
15–20 MW initial mid‑2028 · full build‑out 2032 · 99%+ availabilitySteam‑driven absorption chillers deliver metered chilled water by pipe for process and space conditioning — no tenant chillers, towers or maintenance contracts.
2–8,000 T metered service · 25% below self‑generationWaste‑heat recovery from turbine exhaust turns 1,000 °F heat into process steam, delivered by insulated pipe to each facility.
$2.80 vs $8.80 per 1,000 lb · 68% savings vs tenant boilersOn‑site well water — 1,840 acre‑feet a year guaranteed by water rights exclusive to park tenants — plus wastewater treatment and reuse on campus.
Carrizo‑Wilcox aquifer · San Antonio River dischargeProspects care about a different half depending on where they are in the decision. Both are designed to be contracted together: buy or lease the parcel, then sign a 20‑year service agreement for power, steam, chilled water, water and wastewater.
~1,000 acres straddling Bexar and Wilson Counties, ±500 acres for sale or lease in combinable lots from 4 to 150 acres. Full‑service rail operator on site. Outside San Antonio's ETJ, in an air‑quality attainment area, with clean Phase 1 and developable soils.
A combined heat & power plant inside the park: gas turbines produce electricity, their exhaust makes steam, the steam drives absorption chillers. Every service is metered and piped to the tenant under a 20‑year agreement with guaranteed min/max hourly volumes.
Only six Class I carriers serve the United States. Mission Rail Park has both Union Pacific and BNSF connected on site — which means competitive rail pricing, North‑America‑wide reach to source raw materials and distribute finished goods, and unit trains received and departed with switching and transload handled by the park's operator.
UP + BNSF, co‑located with the Union Pacific railyard. Cross‑border reach to Mexico and Canada.
Two 8,000 ft unit‑train tracks; extra‑large trains up to 150 cars; multiple unit trains per day plus manifest service.
20,000 ft loop and seven 4,000 ft storage tracks engineered, all with access to both carriers — built to tenant need.
Gravity Rail: switching, transload (dry bulk, liquid, hazmat), car storage, repair, park‑owned shunt locomotives and track equipment, truck scale.
Thirty minutes from downtown San Antonio and the international airport, at 9377 CR 128, Floresville — inside the San Antonio–Houston–Dallas triangle, on the I‑35 corridor TxDOT has designated a priority freight and growth corridor through 2030, with regional road links to Port of Houston and the Gulf Coast ports.
East–west, Florida to California — the country's southern freight artery.
North to Dallas, the Midwest and Canada; south to Laredo, the busiest inland port on the Mexico border.
South to Corpus Christi and the Gulf Coast ports; direct connection via Loop 1604.
Air cargo at San Antonio International; deep‑water container and break‑bulk terminals at Houston.

Combined heat and power at industrial scale. High‑efficiency gas turbines generate electricity; integrated waste‑heat recovery turns the exhaust into steam; absorption chillers turn steam into chilled water. Overall energy conversion above 85%, N+1 reliability with battery ride‑through, and every service delivered to the tenant by pipe and wire under a 20‑year agreement.

500 psig, 10" dedicated pipeline into the park. Natural gas is close and built in at reasonable cost.
15–22 MW industrial units added incrementally from 15–20 MW in mid‑2028 to 120 MW+ by 2032.
1,000 °F exhaust converted to process steam; steam drives absorption chillers — no compressor electricity.
Electricity, steam, chilled water, industrial/potable water and wastewater — metered, by pipe and wire, to the plant fence.
More than 100 district heating and cooling systems already operate across the US — including the San Antonio District Cooling Company downtown. The Energy Center brings that model to a manufacturing park: a typical 12+ month tenant construction period lets the plant add generation and thermal capacity ahead of occupancy, so N+1 supply is in place on day one.
The alternatives in Greater San Antonio–Austin offer land, or a single carrier, or a substation. None offer on‑site generation, thermal energy and water rights with both railroads on the property.
| Feature | Mission Rail Park | Port San Antonio | UP Transload Facility | Alamo Junction |
|---|---|---|---|---|
| Acreage · total / available | 1,000 / 500 | 1,900 / 500 | 2,000 | 520 / 300 |
| Class I rail | ✓Both UP + BNSF | UP · limited access | UP only | ✗ None |
| On‑site generation | ✓20–120 MW prime | ✗ No | Substation | ✗ No |
| Steam + chilled water | ✓Both, piped & metered | Chilled water service | ✗ No | ✗ No |
| Water rights on site | ✓Up to 600M gal/yr, on‑site wells | Limited municipal | Limited municipal | Limited municipal |
| Land price · $/SF | On request | N/A (public) | N/A | N/A |
High‑volume, rail‑served manufacturers and processors that use power, heat, cooling and water — and that add value to the park's ecosystem. Not standalone data centers.
01 · On‑shoring · JP · KR · EUGuaranteed power, water and rail from the start; 20‑year utility contracts; straightforward permitting outside the ETJ; a partner ecosystem — CBRE, West East, Gravity Rail, Floresville EDC — that has already done this. Metric and imperial units throughout.
Onshoring guide →
02 · US relocation · CA · NE · MWNo state income tax; abatements and incentives at county and state level; developable land at a fraction of coastal metro cost; energy under $0.10/kWh; a growing labor pool in the 7th‑largest US city — compared line by line against your current site.
Relocation comparison →
03 · Mexico · crossing northI‑35 and I‑37 to Laredo, dual‑rail interchange to Mexico, a USMCA footprint three hours from the border. Bilingual materials on request.
Corredor norte →The collaboration between the State of Texas, the City of San Antonio, Wilson County and the Floresville EDC has been the platform that lets the park fit the needs of a wide array of end users. Logos shown here in one ink; final marks to follow.
"When you have service from two of the largest railroads in the country, it gives you not just nationwide, but North America‑wide rail interconnectivity … That's a very big deal."Jason Jennaro · Partner, Mission Rail Park · Founder, Pascal One Ventures
"It has very developable dirt — clean, stable, environmentally sound. In my experience, it's the cheapest location I've ever found to do any type of development work."John Vossler III · President, Frontier Logistics
Or book a site tour — 30 minutes from downtown San Antonio. Land pricing available on request through CBRE.
PDF e‑brochure · metric + imperial · EN / JA / KO / ES on request